Put commercial kitchen equipment decisions on one project sheet

Use equipment dimensions, supplier dates and installer responsibilities to keep a restaurant build-out moving.

A restaurant can choose a piece of equipment that fits the floor plan and still discover it will not clear the delivery door. Keep one shared sheet for the equipment under consideration. Give each item a model, supplier and owner, plus a place to record whether the project team has reviewed the manufacturer’s specifications.

Check the route and the connection separately

Ask the contractor to confirm which information they need about the delivery path. Have the relevant trades review the manufacturer’s utility and installation requirements. Mark when a dimension is estimated. If a model changes, have the people responsible for delivery and installation review the new specification before committing.

Connect the purchase to the construction schedule

Record the dates the supplier expects to ship and the contractor expects to install. Ask who can receive the shipment and where it will wait if the work area is occupied. Name a person to update the sheet when any of those dates move.